JOUR 11 : Pose du decking

Constuction of the walkway.Bernard, Augustin, Gregg and Jean-Bernard The walkway consists of swings (crossbeam, nailer, and suspenders) spaced horizontally at one meter intervals with decking boards placed longitudinally along the length of the span. Pascal Ingrid Hi there Ingrid and Frances Margaux

Lire la suite
Jour 9 : Dimanche Le Chantier continue

Due to heavy showers and storms, construction was interruped daily. This Sunday, the team was determined to catch up work.  Nothing could stop them in their tracks, not even a fallen tree blocking the road.. At the construction site: A few snapshots of the day

Lire la suite
Jour 6 – Hissage des Mâts

Hoisting the steel suspension towers Jean-Bernard giving out instructions Lio & Clémentine   Pascal & Guilia preparing the crossbeams – Measuring, marking, drilling of the wood planks A well deserved drink! Jean-Bernard with Margaux, Bilge, Ingrid, Lio, Guilia and Clémentine.    

Lire la suite